Please use this identifier to cite or link to this item:
https://repository.unad.edu.co/handle/10596/23433Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Yañez Urbina, Luis Fabian | - |
| dc.coverage.spatial | cead_-_pamplona | spa |
| dc.creator | Villamizar Villamizar, Naslhy Milady | - |
| dc.date.accessioned | 2019-01-22T22:42:53Z | - |
| dc.date.available | 2019-01-22T22:42:53Z | - |
| dc.date.created | 2018-12-20 | - |
| dc.identifier.uri | https://repository.unad.edu.co/handle/10596/23433 | - |
| dc.description.abstract | El siguiente documento contiene la verificación de las actividades ambientales ejecutadas en el proyecto de electrificación rural de los municipios de Tibú y San Cayetano. Con la contribución de la empresa ODMS S.A.S y CONSTRUCCIONES Y MONTAJES ENERGY LTDA, se logró hacer uso de la información y medios necesarios para realizar interventoría a las actividades por medio de las inspecciones en terreno, para obtener una mayor gestión ambiental y cumplimiento de normas y procedimientos establecidos para la construcción de redes eléctricas de media y baja tensión. En base a los resultados obtenidos en los meses Julio, agosto, septiembre, octubre y noviembre del año 2018, se logra hacer seguimiento e implementación de actividades de gestión ambiental con todo el personal operativo encaminadas a la correcta ejecución de poda técnica y tala de árboles. | spa |
| dc.format | spa | |
| dc.format.mimetype | application/pdf | spa |
| dc.language.iso | spa | spa |
| dc.publisher | Universidad Nacional Abierta y a Distancia UNAD | spa |
| dc.title | Verificación y diagnóstico del cumplimiento de normas ambientales en los trazados de redes eléctricas de media y baja tensión, en los municipios de Tibú y San Cayetano proyectados por Centrales Eléctricas del Norte de Santander S.A E.S.P. | spa |
| dc.type | Pasantía | spa |
| dc.subject.keywords | Plan de Manejo Ambiental | spa |
| dc.subject.keywords | Electricidad | spa |
| dc.subject.keywords | Gestión ambiental | spa |
| dc.description.abstractenglish | The following document contains the verification of the environmental activities carried out in the rural electrification project of the municipalities of Tibú and San Cayetano. With the contribution of the company ODMS SAS and CONSTRUCCIONES Y MONTAJES ENERGY LTDA, it was possible to make use of the information and necessary means to carry out supervision of the activities through field inspections, to obtain greater environmental management and compliance with standards and established procedures for the construction of medium and low voltage electrical networks. Based on the results obtained in the months of July, August, September, October and November 2018, it is possible to monitor and implement environmental management activities with all the operative personnel aimed at the correct execution of technical pruning and felling of trees. . | spa |
| dc.rights.accesRights | info:eu-repo/semantics/openAccess | spa |
| dc.rights.acceso | Abierto (Texto Completo) | spa |
| Appears in Collections: | Ingeniería Ambiental | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| nmvillamizarv.pdf | verificación y diagnóstico del cumplimiento de normas ambientales en los trazados de redes eléctricas de media y baja tensión, en los municipios de Tibú y San Cayetano proyectados por centrales eléctricas del Norte de Santander S.A E.S.P. | 4.61 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
