Please use this identifier to cite or link to this item: https://repository.unad.edu.co/handle/10596/31179
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorObando Anaya, Erika Tatiana-
dc.coverage.spatialcead_-_medellínspa
dc.creatorVelasquez Castro, Leidy Lorena-
dc.creatorBenjumea Suaza, Juan Camilo-
dc.creatorPosada Muñoz, Yeison Daniel-
dc.date.accessioned2020-01-28T20:16:47Z-
dc.date.available2020-01-28T20:16:47Z-
dc.date.created2019-12-14-
dc.identifier.urihttps://repository.unad.edu.co/handle/10596/31179-
dc.description.abstractEl sector energético está pasando por un momento de auge económico en el país, cada día se realiza nuevas mega obras que apuntan al fortalecimiento del sistema nacional energético colombiano, Dadas las características topográficas y alivio montañoso que facilita la construcción de hidroeléctricas aprovechando las caídas de los cauces de los Ríos, resaltando sobre todo el potencial hídrico que aborda la región andina, donde en este momento no solo se realiza el proyecto hidroeléctrico más grande del país, sino varias PCH a lo largo de los departamentos que afectan esta zona. Mediante el presente estudio de caso se presenta en contexto los hallazgos reflejados mediante la visita al complejo hidroeléctrico Ituango el cual se localiza sobre el río Cauca, en el llamado "Cañón del Cauca", departamento de Antioquia, a unos 170 kilómetros de la ciudad de Medellín, evaluó aspectos importantes contemplados en las normas ISO 14001: 2015, criterios en los parámetros que deben tener en cuenta para un proyecto en el campo de la generación de energía eléctrica a partir del componente hídrico, frente a la situación ambiental del proyecto , evaluando el ciclo PHVA de mejora continua, en el cual se tienen en cuenta los diferentes aspectos del proceso de implementación y operación.spa
dc.formatpdf
dc.titleCriterios de implementación ISO 14001:2015 caso estudio diagnóstico ambiental proyecto hidroeléctrico Ituango.
dc.typeDiplomado de profundización para grado
dc.subject.keywordsAspectos Ambientalesspa
dc.subject.keywordsDiagnostico Ambientalspa
dc.subject.keywordsImpactos Ambientalesspa
dc.description.abstractenglishThe energy sector is going through a moment of economic boom in the country, every day new mega works are carried out that aim to strengthen the Colombian national energy system, given the topographic characteristics and mountain relief that facilitates the construction of hydroelectric plants taking advantage of the falls of the River channels, especially highlighting the water potential that the Andean region addresses, where at this time not only the largest hydroelectric project in the country is being carried out, but also several PCHs throughout the departments that affect this area. The present case study presents in context the findings reflected through the visit to the Ituango hydroelectric complex which is located on the Cauca River, in the so-called "Cauca Canyon", department of Antioquia, about 170 kilometers from the city of Medellín, evaluated important aspects contemplated in the ISO 14001: 2015 standards, criteria in the parameters that must be taken into account for a project in the field of electric power generation from the water component, against the environmental situation of the project, evaluating The PHVA cycle of continuous improvement, in which the different aspects of the implementation and operation process are taken into account.spa
dc.subject.categoryIngeniería Ambientalspa
Appears in Collections:Diplomado en Gerencia del Sistema Integrado de Gestión en Seguridad Salud Ambiente y Calidad HSEQ

Files in This Item:
File Description SizeFormat 
llvelasquezc.pdf391.07 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.