Please use this identifier to cite or link to this item:
https://repository.unad.edu.co/handle/10596/34391Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | Mesa Mejía, Carlos Guillermo | - |
| dc.coverage.spatial | ccav_-_neiva | spa |
| dc.creator | Moreno Esterlin, Aura del Carmen | - |
| dc.creator | Cruz Useche, Walter Alexander | - |
| dc.creator | Alzate Merchan, Dahiana Stefan | - |
| dc.date.accessioned | 2020-06-01T18:06:18Z | - |
| dc.date.available | 2020-06-01T18:06:18Z | - |
| dc.date.created | 2020-05-25 | - |
| dc.identifier.uri | https://repository.unad.edu.co/handle/10596/34391 | - |
| dc.description.abstract | La Concesionaria Desarrollo Vial al Mar S.A.S. – Devimar, es una sociedad por acciones simplificadas que tiene como objetivos gestionar, desarrollar y mantener uno de los mayores proyectos de vías de Cuarta Generación del Gobierno Nacional; la Autopista al Mar 1 la cual cuenta con una longitud de 176 km y cuyo fin principal es construir una interconexión vial entre la ciudad de Medellín con otras concesiones viales principales del país que a su vez la conecten con otros centros de intercambio comerciales como la Costa Caribe, la Costa Pacífica y con el río Magdalena. Este gran proyecto debe cumplir con toda la normatividad establecida no solo en términos constructivos, sino que además debe garantizar la conservación del Medio Ambiente, así como la Seguridad y Salud en Trabajo para prevenir situaciones que afecten el área de influencia y su imagen con clientes y accionistas. (Devimar, 2020). Devimar cuenta con un equipo de profesionales responsable de implementar la Política Integrada de Gestión que menciona el compromiso de la Alta Dirección por prevenir la contaminación, fomentar la responsabilidad social y ambiental, dando cumplimiento a la normatividad vigente y aplicable. Durante el presente Estudio de Caso desarrollado en el marco del Diplomado de Profundización en Gerencia HSEQ por parte de un grupo estudiantes de la Universidad Nacional Abierta y a Distancia en asocio con el Consejo Colombiano de Seguridad, se logró como resultado identificar la adherencia a la NTC ISO 14001:2015 para Sistemas de Gestión Ambiental, la cual se evaluó a través de un diagnostico ambiental realizado mediante auditoría interna, donde se evidencian diferentes fortalezas de la Concesionaria Devimar, dentro las cuales vale la pena destacar un estudio de impacto ambiental actualizado con los impactos sobre los componentes bióticos y abióticos, así como una matriz de aspectos e impactos ambientales actualizada que relaciona los riesgos y controles ambientales del proyecto. Adicionalmente, se observaron oportunidades de mejora, como lo son la necesidad de fortalecer el cumplimiento del total de los criterios de la ISO 14001:2015, priorizaron el fortalecimiento de su alcance y objetivos ambientales, lo cual le permitirá una vez realizada las acciones de mejora utilizando el ciclo PHVA, mejorar los resultados en su desempeño ambiental. | spa |
| dc.format | ||
| dc.title | Criterios de implementación ISO 14001:2015 Caso Estudio Sector Infraestructura Vial | |
| dc.type | Diplomado de profundización para grado | |
| dc.subject.keywords | Construcción de vías | spa |
| dc.subject.keywords | Ciclo PHVA | spa |
| dc.subject.keywords | Gestión ambiental | spa |
| dc.subject.keywords | Impactos ambientales | spa |
| dc.subject.keywords | Mejora continua | spa |
| dc.description.abstractenglish | The Concessionaire Development of Roads to the Sea. S.A.S. - Devimar, is a simplified stock company that has the objective of managing, developing and maintaining one of the largest Fourth Generation road projects of the National Government; the Highway to the Sea 1 which has a length of 176 km and whose main purpose is to build a road interconnection between the city of Medellin with other main road concessions in the country that in turn connect it with other commercial exchange centers such as the Caribbean Coast, the Pacific Coast and the Magdalena River. This large project must comply with all established regulations not only in terms of construction, but also to guarantee the conservation of the environment, as well as occupational health and safety to prevent situations that could affect the area of influence and its image with clients and shareholders. (Devimar, 2020). Devimar has a team of professionals responsible for implementing the Integrated Management Policy that mentions the commitment of the Senior Management to prevent pollution, promote social and environmental responsibility, in compliance with current and applicable regulations. During the present case study developed in the framework of the Diploma of Deepening in HSEQ Management by a group of students from the National Open and Distance University in association with the Colombian Safety Council, it was possible to identify the adherence to the NTC ISO 14001: 2015 for Environmental Management Systems, which was evaluated through an environmental diagnosis carried out by means of an internal audit, where different strengths of the Devimar Concessionaire are evident, among which it is worth highlighting an updated environmental impact study with the impacts on the biotic and abiotic components, as well as an updated environmental aspects and impacts matrix that relates the project's environmental risks and controls. Additionally, improvement opportunities were observed, such as the need to strengthen compliance with all ISO 14001:2015 criteria, prioritizing the strengthening of its environmental scope and objectives, which will allow it, once the improvement actions have been carried out using the PHVA cycle, to improve the results in its environmental performance. Keywords: Environmental impacts, road construction, PHVA cycle, improvement, environmental management | spa |
| dc.subject.category | Ingeniería Ambiental | spa |
| Appears in Collections: | Diplomado en Gerencia del Sistema Integrado de Gestión en Seguridad Salud Ambiente y Calidad HSEQ | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| admorenoe.pdf | 1.27 MB | Adobe PDF | ![]() View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
