• español
    • English
    • français
    • português
A+A-
  • English 
    • español
    • English
    • français
    • português
    • Usage guides
      • Guidelines for the advisor work direcor
      • Guidelines for the student who loads degree work
      • APA 7 Edition Standards
      • Tips APA 7 Edition Standards
    • Users
    View Item 
    •   National Open and Distance University UNAD
    • Producción Científica
    • Sello Editorial UNAD
    • Revista Estrategia Organizacional
    • View Item
    •   National Open and Distance University UNAD
    • Producción Científica
    • Sello Editorial UNAD
    • Revista Estrategia Organizacional
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Gestión económica del BPM (Busines Process Management) en la productividad de las pymes metalmecánicas en la localidad de Fontibón de la ciudad de Bogotá

    Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of Bogotá

    Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of Bogotá

    Thumbnail
    QRCode
    Share
    Author
    Rodríguez Pinzón, Julio Alberto
    Palencia Fajardo, Ofelia
    Publisher
    Universidad Nacional Abierta y a Distancia, UNAD

    Citación

           
    TY - GEN T1 - Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of Bogotá T1 - Gestión económica del BPM (Busines Process Management) en la productividad de las pymes metalmecánicas en la localidad de Fontibón de la ciudad de Bogotá AU - Rodríguez Pinzón, Julio Alberto AU - Palencia Fajardo, Ofelia PB - Universidad Nacional Abierta y a Distancia, UNAD AB - ER - @misc{10596_32839, author = {Rodríguez Pinzón Julio Alberto and Palencia Fajardo Ofelia}, title = {Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of BogotáGestión económica del BPM (Busines Process Management) en la productividad de las pymes metalmecánicas en la localidad de Fontibón de la ciudad de Bogotá}, year = {}, abstract = {}, url = {} }RT Generic T1 Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of Bogotá T1 Gestión económica del BPM (Busines Process Management) en la productividad de las pymes metalmecánicas en la localidad de Fontibón de la ciudad de Bogotá A1 Rodríguez Pinzón, Julio Alberto A1 Palencia Fajardo, Ofelia PB Universidad Nacional Abierta y a Distancia, UNAD AB OL Spanish (121)
    Bibliographic managers
    Refworks
    Zotero / EndNote / Mendeley
    BibTeX
    CiteULike
    Metadata
    Show full item record
    Abstract
    Introducción: el propósito es aplicar la metodología BPM (Business Process Management), en las Pymes Metalmecánicas de la ciudad de Bogotá (Localidad de Fontibón), y proponer las buenas prácticas en el logro de la productividad a través del método ITIL (Biblioteca de la Infraestructura de Tecnologías de Información). La implementación del BPM, buscará una visión integral de estas Pymes mediante una gestión compuesta de metodologías y tecnologías, cuyo objetivo es mejorar su desempeño con eficiencia y eficacia en la optimización de los procesos y recursos. Metodología: la investigación es descriptiva.  Para la recopilación de la información se utilizó la técnica de la Encuesta aplicada en fuentes primarias a 35 Pymes según muestra representativa del DANE(2018),habiéndo seleccionado los Grupos CIIU2817/2819/2822 , de la clasificación de las Naciones Unidas. Resultados: En las Pymes Metalmecánicas de la ciudad de Bogotá (Localidad de Fontibón) se pudo evidenciar la existencia de procesos retrógrados y obsoletos, falta de capacitación del personal, la no implementación de nuevos procesos, la falta de adopción de buenas prácticas, lográndose grandes mejoras y beneficios en su proceso productivo mediante la utilización del BPM y el método ITIL (Biblioteca de la Infraestructura de Tecnologías de Información) en sus diferentes procesos de gestión, lo cual llevaría a un cambio en la cultura organizacional, haciéndose necesario la capacitación continua para el personal de la empresa en los diferentes niveles sobre los nuevos procesos y el uso de las herramientas TIC. Así mismo con la implementación del BPM y la metodología ITIL (Biblioteca de la Infraestructura de Tecnologías de Información) para la propuesta de buenas prácticas de productividad, puede traer grandes en todos ...
     
    The purpose of this paper is to apply the BPM methodology (Business Process Management), in the Metalworking SMEs of the city of Bogotá (Town of Fontibón), and propose good practices in achieving productivity through the ITIL method (Library of the Information Technology Infrastructure). Also the statistics of the Monthly Manufacturing Survey of DANE-Dec. 2018. (DANE, 2018) show that SMEs in the metalworking industry comparing the year 2018 with 2017 decreased their sales, their production, the staff employed in both the production area and the administrative and sales levels in very significant percentages, which They show low productivity and competitiveness. The implementation of the BPM will seek an integral vision of these SMEs through a management composed of methodologies and technologies, whose objective is to improve their performance with efficiency and effectiveness in the optimization of processes and resources. The Descriptive Research methodology was used. For the collection of the information, the Survey technique applied in primary sources to 35 SMEs was used according to a representative sample of the DANE (2018), having selected the ISIC2817 / 2819/2822 Groups, from the United Nations classification. Likewise, the use and implementation of the BPM and the ITIL method (Library of Information Technology Infrastructure) will lead to great improvements and benefits in the different processes of the organization.
     
     
    College
    https://hemeroteca.unad.edu.co/index.php/revista-estrategica-organizacio/article/view/3646/3846
    https://hemeroteca.unad.edu.co/index.php/revista-estrategica-organizacio/article/view/3646/4988
    https://hemeroteca.unad.edu.co/index.php/revista-estrategica-organizacio/article/view/3646/3686
    https://hemeroteca.unad.edu.co/index.php/revista-estrategica-organizacio/article/view/3646/4989
    Format
    application/pdf
    text/html
    text/xml
    Type of digital resource
    info:eu-repo/semantics/article
    info:eu-repo/semantics/publishedVersion
    URL source
    https://hemeroteca.unad.edu.co/index.php/revista-estrategica-organizacio/article/view/3646
    http://dx.doi.org/10.22490/25392786.3646
    Collections
    • Revista Estrategia Organizacional [421]

    Related items

    Showing items related by title, author, creator and subject.

    • Thumbnail

      Integration plan of project management institute (PMI) standards and building information modeling (BIM) methodology to construction project management for Colombia 

      Victoria Mazuera, Julián Andrés (Sello Editorial UNAD, 2021-12-15)
      Construction project management is constantly looking for new practices, methodologies and constant improvements in all its processes and areas of knowledge to meet the main objectives of construction, the PMI standards is a worldwide recognized methodology and that in Colombia in recent years 20 years has been adapted to many fields of both private and public project management, the PMI methodology is developed in ...
    • Thumbnail

      Economic management of the BPM (Business Process Management) in the productivity of metalworking SMEs in the town of Fontibón in the city of Bogotá 

      Rodríguez Pinzón, Julio Alberto; Palencia Fajardo, Ofelia; Rodríguez Pinzón, Julio Alberto; Palencia Fajardo, Ofelia (Sello Editorial UNAD, 2020-02-20)
      The purpose of this paper is to apply the BPM methodology (Business Process Management), in the Metalworking SMEs of the city of Bogotá (Town of Fontibón), and propose good practices in achieving productivity through the ITIL method (Library of the Information Technology Infrastructure). Also the statistics of the Monthly Manufacturing Survey of DANE-Dec. 2018. (DANE, 2018) show that SMEs in the metalworking industry ...
    • Thumbnail

      Integration plan of project management institute (PMI) standards and building information modeling (BIM) methodology to construction project management for Colombia 

      Victoria Mazuera, Julián Andrés (Sello Editorial UNAD, 2021-12-15)
      Construction project management is constantly looking for new practices, methodologies and constant improvements in all its processes and areas of knowledge to meet the main objectives of construction, the PMI standards is a worldwide recognized methodology and that in Colombia in recent years 20 years has been adapted to many fields of both private and public project management, the PMI methodology is developed in ...
    Usage guidesNormativityGuidelines for the advisor work direcorGuidelines for the student who loads degree workAPA 7 Edition StandardsTips APA 7 Edition Standards

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister
    GTM statisticsGTM statistics
    Indexed by:
    logo_Open Archives Initiative
    logo_Biblioteca Digital Ecuatoriana
    logo_OpenDOAR
    logo_Open ROAR
    logo_Google Scholar
    logo_Lyrasis
    logo_WorldCat
    logo_FAO
    logo_AGRIS
    logo_Alianza de Servicios de Información Agropecuaria
    logo_Siembra
    logo_Fedesarrollo
    logo_Colombia Digital
    logo_Hemeroteca UNAD
    logo_RED DE REPOSITORIOS LATINOAMERICANOS
    logo_OAIster
    logo_La Referencia
    logo_Open AIRE
    logo_Core
    logo_Base
    logo_CLACSO
    logo_OpenAlex
    logos isopreadGreat Work to PlaceIcontec - Great Work to Place

    Línea anticorrupción: 3232641617 ext. 1544

    En Bogotá D.C. (Colombia) Teléfono: 323 264 1617 - Línea gratuita nacional: 323 264 1617

    Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional

    Universidad Nacional Abierta y a Distancia UNAD de Colombia - © Copyright UNAD 2024

    Síguenos en: