• español
    • English
    • français
    • português
A+A-
  • English 
    • español
    • English
    • français
    • português
    • Usage guides
      • Guidelines for the advisor work direcor
      • Guidelines for the student who loads degree work
      • APA 7 Edition Standards
      • Tips APA 7 Edition Standards
    • Users
    View Item 
    •   National Open and Distance University UNAD
    • Producción Científica
    • Sello Editorial UNAD
    • Revista Publicaciones e Investigación
    • View Item
    •   National Open and Distance University UNAD
    • Producción Científica
    • Sello Editorial UNAD
    • Revista Publicaciones e Investigación
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Dimensionamiento matemático de obras hidráulicas para una pequeña central hidroeléctrica en Río Negro, Cundinamarca mediante métodos lógicos deductivos por medio de ábacos y gráficas obsoletas

    Mathematical dimensioning of hydraulic works for a small hydroelectric power plant in Rio Negro, Cundinamarca through deductive logical methods through obsolete abacus and graphicss

    Mathematical dimensioning of hydraulic works for a small hydroelectric power plant in Rio Negro, Cundinamarca through deductive logical methods through obsolete abacus and graphicss

    Thumbnail
    QRCode
    Share
    Author
    Girón Cuervo, Nicolás
    Publisher
    Sello editorial UNAD

    Citación

           
    TY - GEN T1 - Mathematical dimensioning of hydraulic works for a small hydroelectric power plant in Rio Negro, Cundinamarca through deductive logical methods through obsolete abacus and graphicss T1 - Dimensionamiento matemático de obras hidráulicas para una pequeña central hidroeléctrica en Río Negro, Cundinamarca mediante métodos lógicos deductivos por medio de ábacos y gráficas obsoletas AU - Girón Cuervo, Nicolás UR - https://repository.unad.edu.co/handle/10596/47158 PB - Sello editorial UNAD AB - ER - @misc{10596_47158, author = {Girón Cuervo Nicolás}, title = {Mathematical dimensioning of hydraulic works for a small hydroelectric power plant in Rio Negro, Cundinamarca through deductive logical methods through obsolete abacus and graphicssDimensionamiento matemático de obras hidráulicas para una pequeña central hidroeléctrica en Río Negro, Cundinamarca mediante métodos lógicos deductivos por medio de ábacos y gráficas obsoletas}, year = {}, abstract = {}, url = {https://repository.unad.edu.co/handle/10596/47158} }RT Generic T1 Mathematical dimensioning of hydraulic works for a small hydroelectric power plant in Rio Negro, Cundinamarca through deductive logical methods through obsolete abacus and graphicss T1 Dimensionamiento matemático de obras hidráulicas para una pequeña central hidroeléctrica en Río Negro, Cundinamarca mediante métodos lógicos deductivos por medio de ábacos y gráficas obsoletas A1 Girón Cuervo, Nicolás LK https://repository.unad.edu.co/handle/10596/47158 PB Sello editorial UNAD AB OL Spanish (121)
    Bibliographic managers
    Refworks
    Zotero / EndNote / Mendeley
    BibTeX
    CiteULike
    Metadata
    Show full item record
    Abstract
    Determinamos nuestro sistema híbrido (Ortiz Flórez, 2011) como la presa, aliviaderos, canal, tomas de agua, tuberías, turbinas, casa de máquinas, generadores y entre otros para nuestro proyecto, todos los cuales son elementos que nos ayudarán a cumplir el propósito de este trabajo que es la elaboración de una guía que permita reducir las incertidumbres generadas en los estudios de pre-factibilidad de pequeñas centrales hidroeléctricas, con un rango de instalación de 1.000 a 10.000 kW, los dimensionamientos matemáticos como lo son las dimensiones reales, cantidades de obra que se requieren para ellas y precios de cada parte que construye el sistema. La producción de energía eléctrica es vital para mantener nuestro estilo de vida y así mismo el desarrollo económico de los países. Colombia produce alrededor del 70% de su energía por medio de las centrales hidroeléctricas, las cuales, durante sus etapas de construcción, operación y abandono, generan diferentes impactos acumulativos negativos (Vargas Nieto, 2018). Al identificar esta problemática optamos por proponer una metodología para aplicar el principio de precaución, el cual ha sido un instrumento fundamental en la toma de decisiones que se ha consolidado progresivamente en el derecho ambiental internacional. La fase de pre-factibilidad de una central hidroeléctrica conlleva señalar la capacidad de generación de energía eléctrica anual así como su potencial eléctrico que es posible instalar en la cuenca Río Negro, la cual cuenta con una variedad de cotas de nivel desde la 3.500 msnm del departamento de Cundinamarca hasta la cota 670 msnm del mismo departamento donde se propone ubicar la casa de máquinas para la central, es decir en la cota 2.900 msnm, aparte de ello la cota de captación es 3.000 msnm. Usando una metodología ...
     
    We determine our hybrid system (Ortiz Flórez, 2011) as the dam, spillways, canal, water intakes, pipes, turbines, machine house, generators and among others for our project, which all these are elements that help us fulfill the purpose of this work which is the elaboration of a guide that allows to reduce the uncertainties generated in the pre-feasibility studies of small hydroelectric plants, with an installation range of 1000 to 10,000 kW, the mathematical dimensions such as the real dimensions, quantities of work that is needed for them and prices of each part that builds the system. The production of electricity is vital to maintain our lifestyle and the economic development of the countries. Colombia produces around 70% of its energy through hydroelectric power plants, which during its construction, operation and abandonment stages, different negative cumulative impacts (Vargas Nieto, 2018). In identifying this problem, we chose to propose a methodology to apply the precautionary principle, which has been a fundamental instrument in decision-making that has been progressively consolidated in international environmental law. The pre-feasibility phase of a hydroelectric power plant leads to the annual electric power generation capacity as well as its electrical potential that is possible to install in the Río Negro basin, which has a variety of level levels from the 3,500 masl of the department from Cundinamarca to the 670 meters above sea level of the same department where it is proposed to locate the powerhouse for the plant, that is to say at 2900 meters above sea level, apart from that the catchment level is 3000 meters above sea level. Using a simple methodology that in broad strokes is the identification of major fall in the course of the river in the smallest distance (Ortiz Flórez, 2011) and in turn is developed as a guide which based on in order to make correlations to determine a design flow and with this dimension the hydraulic works previously specified and with them determine a list of prices that help select the best alternative and get unit prices to total together with the quantities of work and thus determine its price and the price of the nstalled kW, for more Clarity of the methodology used below is explained in detail.
     
     
    College
    https://hemeroteca.unad.edu.co/index.php/publicaciones-e-investigacion/article/view/3652/3692
    https://hemeroteca.unad.edu.co/index.php/publicaciones-e-investigacion/article/view/3652/3696
    https://hemeroteca.unad.edu.co/index.php/publicaciones-e-investigacion/article/view/3652/5079
    Format
    application/pdf
    text/html
    text/xml
    Type of digital resource
    info:eu-repo/semantics/article
    info:eu-repo/semantics/publishedVersion
    URI
    https://repository.unad.edu.co/handle/10596/47158
    URL source
    https://hemeroteca.unad.edu.co/index.php/publicaciones-e-investigacion/article/view/3652
    http://dx.doi.org/10.22490/25394088.3652
    Collections
    • Revista Publicaciones e Investigación [799]
    Usage guidesNormativityGuidelines for the advisor work direcorGuidelines for the student who loads degree workAPA 7 Edition StandardsTips APA 7 Edition Standards

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    LoginRegister
    GTM statisticsGTM statistics
    Indexed by:
    logo_Open Archives Initiative
    logo_Biblioteca Digital Ecuatoriana
    logo_OpenDOAR
    logo_Open ROAR
    logo_Google Scholar
    logo_Lyrasis
    logo_WorldCat
    logo_FAO
    logo_AGRIS
    logo_Alianza de Servicios de Información Agropecuaria
    logo_Siembra
    logo_Fedesarrollo
    logo_Colombia Digital
    logo_Hemeroteca UNAD
    logo_RED DE REPOSITORIOS LATINOAMERICANOS
    logo_OAIster
    logo_La Referencia
    logo_Open AIRE
    logo_Core
    logo_Base
    logo_CLACSO
    logo_OpenAlex
    logos isopreadGreat Work to PlaceIcontec - Great Work to Place

    Línea anticorrupción: 3232641617 ext. 1544

    En Bogotá D.C. (Colombia) Teléfono: 323 264 1617 - Línea gratuita nacional: 323 264 1617

    Institución de Educación Superior sujeta a inspección y vigilancia por el Ministerio de Educación Nacional

    Universidad Nacional Abierta y a Distancia UNAD de Colombia - © Copyright UNAD 2024

    Síguenos en: